After the PV inverter, how to achieve the same period before the network?

After the PV inverter, how to achieve the same period before the network?

Answer:

Grid simulator: analog power grid, normal and abnormal conditions, overvoltage, undervoltage, over frequency, under frequency, sudden power failure, etc.
Solar panel simulator: with MPPT function, simulated morning, noon, afternoon, evening, rainy weather, solar panels produced under different conditions in different voltages.
When the voltage, frequency, phase does not meet the requirements, the automatic closing closing pulse.
It can automatically detect the generator and the grid frequency and voltage, in the frequency, voltage, phase are in line with the requirements of the grid to set the time before the release of the closing signal, so that it can be safely and securely connected.