Steel formwork in the construction project, after the completion of concrete pouring, the wall surface from the powder seriously how to deal with?

Answer:

Two possibilities, one is the vibration of concrete and other factors to produce concrete segregation; the two is the ratio of the concrete itself (see a similar situation, pumping agent over)
This is no problem with the steel template, the ratio of concrete problems!
There is a problem with the ratio of the concrete itself.