Question:

Asphalt tile laying method

Asphalt tile laying method

Answer:

(7) laying the roof asphalt shingles, first on the roof of the two roof surface has been laid up to the slope and roof of the last few asphalt tiles Slightly adjusted so that the roof asphalt shingles can fully cover the top of the asphalt shingles, and roof ridge on both sides of the overlap of the same width, fixed with a nail, the exposed nail coated with asphalt.
(5) laying the third layer of asphalt shingles, cut the first layer of asphalt shingles of the first layer of asphalt shingles, so that it is staggered with the first layer of the second layer of asphalt shingles, and the bottom of the third layer of asphalt shingles (6) laying the asphalt shingles on the gutter, the asphalt tiles in the intersecting roof are in two On the roof at the same time to the direction of the laying of the gutter or each side of the separate construction, are laid to the gutter centerline 75mm, and then along one of the roof of the eaves up the laying of gutter asphalt tiles, and stretched over the gutter, The last gutter asphalt tiles of the layer to the adjacent roof at least 300mm, and then along the roof of the roof of the laying of gutter asphalt tiles, at the same time to reach the gutter and lap to the previously laid gutter asphalt tiles, Weave together, put the gutter asphalt tiles
(4) laying the second layer of asphalt shingles, the second layer of the first asphalt shingles with the first layer of the first layer of the first layer of the same as the first layer Asphalt tile side staggered half a leaf, the second layer of Lek The bottom edge of the green tiles is flush with the top of the first layer of asphalt shingles, and the second layer of asphalt tiles is parallel to the cornices on the first layer of asphalt shingles. Fixed;
and then (3) laying the first layer of asphalt shingles, the first asphalt shingles to remove 167mm, then re-use the entire asphalt shingles, and then the same as the two nails in the horizontal direction evenly set 2 nails; Laying the first layer of asphalt tiles along the edge of the wall and cornice and the initial layer of asphalt tiles edge of the alignment at both ends of the bottom from the bottom edge of 60.8mm and 35.4mm from the side of the side were fixed with a nail
(1) First, the roof with cement mortar leveling, leveling thickness of 28-35mm; (2) the laying of the initial layer of asphalt shingles, the initial layer of asphalt shingles adhesive face up, along the roof of the slope directly at the bottom Laying on the roof surface, at the end of the wall and cornice position, the initial layer of asphalt tiles out of 5-10mm, at both ends of the bottom from the bottom edge of 50.8mm and 25.4mm from the side of the place were fixed with a nail,