Large engineering construction (such as buildings, factories, institutions) distribution room of the power equipment as required? What's the difference? For example, some requirements never power, and some to eliminate harmonics to improve power quality, the more detailed the better the program

Answer:

In the vicinity of the power grid in the supply of power on the requirements of their own generators to ensure that the dual power supply. Factories and institutions to see what the main work, if it is steel, hospital, such as the load category one or two categories of power needs of the dual power supply. And the load such as electric furnace, easy to produce harmonics, in order to ensure the power quality of the grid, it requires the installation of harmonic elimination device.
And some equipment is required to use the 6kV power supply, voltage level and the load of the device determines the choice of power equipment rated voltage, current value. Building, there are generally important electrical equipment such as elevators, in the national specification clearly requires, a class, two types of load is not allowed to power outages, which long requires the use of dual power supply
Construction of electricity, then it is necessary to look at the site to enter the electricity equipment, under normal circumstances, with 380, 220V power is enough