Home > categories > Electrical Equipment & Supplies > Other Wires, Cables & Cable Assemblies > Buy Taipower c 450P with remote control to add audio and video cable
Question:

Buy Taipower c 450P with remote control to add audio and video cable

Apple 6 Charging Why always show this cable has not yet been certified

Answer:

Cable and cable distinction In fact, "wire" and "cable" and there is no strict boundaries
Set-top box with the AV cable connection: yellow - video, red and white - audio, corresponding to the TV's AV input interface can be connected (do not receive the TV component interface). As for the emergence of partial pink, the possible reasons are: . poor contact. You will re-connect the three-color AV cable to the set-top box, on the TV, to ensure good contact. . cable quality. Three-color AV cable may not be the quality, if you can replace a group of try, or use the DVD and other equipment connected with the TV to test the AV line with or without problems. . TV AV input failure. You can use other video source equipment connected to the TV test, such as: DVD, VCD machines and so on. . set-top box failure. May be set-top box AV output port problems, if there are multiple sets of AV output, you can try other port okay, not the case may be the quality of set-top box, call customer service it.
And I answered the other person's question is very similar: . the line of the banding distance of not more than 1.2 meters, the two ends of the wire box outlet tube 15CM should be ligation; . casing embedded, then through the basement wall, the surface must be installed rigid Waterproof casing, that is, steel pipe + water ring; through the fire pool, living pool: flexible waterproof casing; (wing ring specific practices can be collected online related Atlas); through the floor, according to whether the design requirements , Under normal circumstances PVC casing on it. Note: . rigid waterproof casing, flexible waterproof casing is a one-time reserved in place, through the floor of the casing of the flower lamb to suppress the barge of Xi Jie Xi Xi shou, is the first stay hole, when the installation of riser Casing, because the floor casing has every layer, the location of the reservation will always be biased, in order to ensure vertical vertical pipe, and finally unified hanging line repair hole and then install the riser and casing. . now most of the bathroom are dirty, waste and diversion, and more of the riser, and so on, the air conditioning casing of all the shear wall should be embedded, to avoid the subsequent damage to the structure of drilling (no stay can only drill) Note that the location of the hole and the installation of the riser will affect the opening of the toilet window. . the casing is the casing, riser is the riser, casing than the riser model 1 to 2 level. . plate at the end of flat, board 2 to 5CM higher to see if you need to do leveling layer.

Share to: