Question:

Cantilever scaffold of the I-beam, in the Yang Kok position encountered a frame column, what should I do?

Cantilever scaffold of the I-beam, in the Yang Kok position encountered a frame column, what should I do?

Answer:

Through the column, but that you also don't take root I-beam out, the scaffolding removed after directly cut off, make a good corrosion on the inside.
The frame column can be passed through, and the prefabricated formwork box is needed, and the I-beam can be drawn out later.
In fact, this should be good to deal with, if there are plans to say that.Cantilever structure encountered structural column, can be considered to be cantilevered into simply supported, namely the constructional column embedded corbel, the distal cantilevered on the bracket, the cantilever is more favorable, the original cantilever beam into force, better.