Question:

Classification and erection of scaffolding and related specifications

The classification of scaffolding and the relevant provisions of the provisions of the installation, please explain professional, thank you

Answer:

1, the height of the super 24M drop steel scaffolding; 2, attached to the lifting of the scaffolding, including the overall lifting and chip upgrade; the 3, cantilevered scaffolding; the door scaffolding, scaffolding, the scaffolding, scaffolding, the scaffolding; the 5, hanging basket, scaffolding, scaffolding, and so on; 6;
2, scaffolding construction should be appropriate qualifications for safety in production permit in accordance with the construction of the scaffolding for the implementation of special case of Wu erection qualification prohibited the construction team to set up construction, 3 steel tubular scaffolding steel tube, fastener, wall fittings etc. shall be in accordance with the "construction of steel tubular scaffold Safety specifications" (JGJ130-2001) requirements and factory certification, inspection report inspection qualified components for 4 steel tubular scaffolding, scaffolding operations engineering supervisor should strengthen inspection found the construction according to the special case of the implementation of existing safety accidents should be in accordance with the relevant provisions of the written instructions and construction units ordered rectification or stop two, construction scaffolding technology standard 1 basic requirements, the pole base (base plate) a malleable cast iron manufacturing and welding base two erection scaffold Wooden plate paving base pole again put into the base plate in the bottom area of the calculation and should be less than 2 degrees, the thickness of 50mm to cross the wooden shim plate adopts steel plate 2, using plywood as cantilever scaffold cantilever beam layer cantilever scaffold with cantilever beam or cantilever frame with steel cantilever beam should be prohibited (I-beam, channel) made of cantilever frame made from steel tubes connected by the fastener 3, operation layer, protective railing railing ramps block baseboard shall be erected outside the pole inside; rail height should be 1200mm; the railing height should be 600mm; in 180mm4, the block foot height should be within the framework of closed scaffolding laying scaffold should be at least two layers. Operation layer protective layer operation layer protective layer of scaffold safety net fallback
7, the unloading platform progress specification in our city construction scaffolding scaffolding collapse prevention effect falling accident according to the "construction safety management regulations" "construction of steel tubular scaffold safety technical specifications" (JGJ130-2001) related matters notice: now, the scaffold erection procedures for the implementation of the 1 basic requirements, construction the enterprise construction project before the implementation of special case according to the characteristics of building scaffolding (highly 24m tubular steel scaffolding, cantilever scaffold should be attached to the safety check node) the case should be responsible for the enterprise technology (General Engineering) signed by the chief supervision engineer signature recognition project review organization and implementation review does not pass the special construction case the implementation of