Question:

Composite floor construction process

1. installation of the floor pretreatment {ground flat; moisture-proof film laying} 2. Composite floor installation {splicing the same size; wall tailoring straight; composite floor flat} 3. The pupil is at the same elevation. The content should be understood in detail. Know who answer, do not know do not want to copy any paste online. Thank you! More

Answer:

Composite floor ground construction procedures: cement mortar leveling oil - mat composite wood floor moisture - proof mat - composite wood floor board installation. Composite floor layer construction is mainly composed of surface layer of the fixed and the surface of the surface treatment. Fixed way to fix the main fixed. That is, with the yuan nail will be fixed on the surface of the cement floor. The shape of the board should be considered to facilitate the laying of nails, fixed and solid, the use of beautiful requirements. For corridors, aisles and other parts, should be laid along the direction of walking; and indoor rooms, should be along the light shop nails. For most rooms, along the light shop nail, with the direction of walking is the same.
1. After the ground mortar. Can be dry. Laying moisture-proof paper. Add pest control against termites. 2. When the floor is laid. Choose the direction of laying. Wood flooring paving the best according to Shun Guang paving, so that the floor seams will not see the special display, the majority of the floor of the paving is to shop into the vertical paving, paving before you try to fight, so that you can put Loss to a minimum. Master is also more serious and responsible, this is a large piece of the floor to set the floor of the floor, so that a small floor can be just spread to that piece, so the use of small, so as not to waste material. 3. When laying the baseboard, must be fixed firmly. So as not to loose in the future.
1. After the ground mortar. Can be dry. Laying moisture-proof paper. Add pest control against termites. 2. When the floor is laid. Choose the direction of laying. Wood flooring paving the best according to Shun Guang paving, so that the floor seams will not see the special display, the majority of the floor of the paving is to shop into the vertical paving, paving before you try to fight, so that you can put Loss to a minimum. Master is also more serious and responsible, this is a large piece of the floor to set the floor of the floor, so that a small floor can be just spread to that piece, so the use of small, so as not to waste material. 3. When laying the baseboard, must be fixed firmly. So as not to loose in the future.