Home > categories > Construction & Real Estate > Engineered Flooring > Composite flooring installation requires tools,
Question:

Composite flooring installation requires tools,

Composite flooring installation requires tools,

Answer:

There are some fixed-floor installation tools are fixed, some are in accordance with their own installation techniques to their own custom, the installation of the master can buy some of the most basic installation tools such as circular saw, hammer, angle grinder, curve saw, straight Ruler, tape, woodworking saws, carpentry chisel, small hammer, angle ruler, ruler, pencil, special wood wedge, special wood, special retractor and floor glue. These are the tools to be prepared to lay the floor, the first floor of the floor moisture-proof plastic film, and then in the moisture-proof film on the floor, intestinal plaque prostitutes illusion to do Wei-wei and then use the nails to the corner of the skirt, moisture film, steel Nails, laying mats, corners. Pave the floor of the tools are generally self-made, there is no standard, you can do a Z-type tool, hold down with a hammer can knock on the other side can go. Mainly the scale of the gap to grasp, according to the home of the humidity and regional preparation, or later easy to drum from what.
Wooden floor installation requires the following tools: Power tools: hammer, pistol drill, marble sawing machine, curve saws, steam pump, steam gun, electric planer, mill, belt sander. Hand tools: hand saws, knife saws, fountains, steel tape, angle ruler, pencil, pull rope, hammer, ax, rubber hammer, punch, scraper, screwdriver, pliers, flat chisel, planing, Special tools: move the hook, tighten the hook. Wood flooring installation process should pay attention to: 1, wood flooring can not buy that shop, should be opened in the new home after a period of time and then shop, so that the wooden floor to adapt to the new environment. 2, do not think that the wood floor can not contain water, in fact, left the water, the wood floor becomes very hard, at the foot of the feeling is not the same, so to keep the wood floor water content of about 14%, of course, this is a professional tool inspection of. 3, wood grille and the ground between the grass-roots should retain a certain gap (primary school textbooks to teach us, to know how to stay a seam), to ensure that the entire ground dragon air patency, do not use cement mortar plug to fix the wood grid In order to use the mattress method, the wooden grille shall be firmly fixed to the ground with nails. 4, shop wood flooring should be cleaned before the wooden grille, sprinkle with moisture-proof powder and pest control powder. This is to prevent insects from eroding the wood flooring material and destroying the structure of the wood floor. 5, nail wood floor nails must use twist nails, first in the mouth of the mouth oblique drilling (holes should be perpendicular to the length of the floor), and then into the wooden grille, or the use of the process is likely to cause loose wood flooring. 6, after the laying of wood flooring to use cardboard, old sheets or old mats and other cover protection. The purpose of this is to protect the original installation of the wood floor structure, firm its structure.

Share to: