Home > categories > Construction & Real Estate > Form Traveler > Construction of hanging basket hanging blue construction
Question:

Construction of hanging basket hanging blue construction

nan

Answer:

8, the hanging basket to be symmetrical, before walking to the longitudinal axis, in the track to draw the control line, walking on both sides of the journey to be consistent, the right axis;9, cradle walking to a certain position, should be promptly on the web side, floor modified and polished, the concrete appearance of minor fault, consistent with the flat drill tick, not daub, sling to timely plugging holes;10, sling reserved holes to be correct, to ensure that the vertical sling force, there can be no bending;11, hanging basket after walking in place, anchor hanging basket anchor, so that the basket is basically in a horizontal position, walking car to be in a state of freedom, not force;12, the fixed horizontal pump or pulling heavy, not by hanging basket as the anchor, prevent hanging force displacement or overturning;13, before pouring concrete, fill in the "hanging basket construction inspection form".
1, should hold a special type of work permit;2, before the job requirements for safety technical disclosure;3, simple and flexible clothing, wear non slip shoes;4, is strictly prohibited drink posts;
Wear safety helmet. Hanging basket construction is the key to the success or failure of cantilever casting, so the safety of the construction of hanging basket is critical, the construction must pay attention to the following matters:1, after the completion of the hanging basket, the class (Group) must be carried out after the suspension of the anchor system, fulcrum, sling, etc. to carry out a comprehensive and detailed inspection, to ensure that its force in line with the design requirements;2, cable belt, steel tape, steel straps are the main force, the material is special, absolutely can not carry out welding work on it, be careful not to burn the construction, cable belt and suspenders;3, the use of connectors and anchor bars, must be in the finishing of the rebar end of the paint marks, installation to ensure that the installation of steel in place, generally into the connector is not less than 8cm;
4, a hanging basket of the main truss of the back of a total of 4 finished steel rebar, a hanging basket after the anchor needs a total of 8 finished rebar rebar anchor, hanging blue in place to anchor in time;5, lifting jack hanging basket, lift the hanging basket to ensure the integrity of the crane, is strictly prohibited overload;6, the front of the top of the 4 straps to be uniform, in the adjustment of elevation, the top of the sling to be adjusted, can not be adjusted after the first 2 in the absence of the instrument to monitor the situation in addition to the other 2 root 4;7, hanging blue walk, to ensure that the sling, templates and so on and the separation of blue, and sent to observe whether the normal walk. Hang blue, template and box beam or other items are friction, care, and found that the abnormal walking should immediately stop, identify the reasons for treatment and then began to walk;8, the hanging basket to be symmetrical, before walking to the longitudinal axis, in the track to draw the control line, walking on both sides of the journey to be consistent, the right axis;