Home > categories > Machinery & Equipment > Suspended Platform > Construction plan for mounting basket on steel pipe support frame
Question:

Construction plan for mounting basket on steel pipe support frame

Construction plan for mounting basket on steel pipe support frame

Answer:

(1) the plug rod is inserted into the front bracket casing triangle, according to the parapet height, the height of the bars inserted in the regulation of the range of 1.15-1.75 m, fixed with bolts, complete the front seat installation. (2) insert the rod into the rear bracket; the height of the rod is higher than the front bracket and the inserting rod; the bolt is used for fixing the back seat.
On the steel pipe support frame, according to the mounting basket and the ordinary outer wall, the construction and the mounting basket method is same. Only in the steel pipe bracket to install the basket, should pay attention to avoid the steel pipe support, avoid the steel pipe support, influence the rise and fall of the electric basket. Thus affecting the normal work of the electric basket
(3) the front and rear beams are respectively arranged before and after stent insertion within the casing, with the beam to the front and rear beams set, and according to the situation before the selected overhanging beam, the distance between the front and rear supports should be put to the maximum, will be placed on the front seat pillar rod sleeve. The small connecting sleeve is arranged on the inserting rod sleeve of the back support, and is fixed by bolts, and the bracket is assembled and completed.

Share to: