Question:

Flange blind plate production and installation should be fixed what quota ah?

Flange blind plate production and installation should be fixed what quota ah?

Answer:

Use installation quota sixth book "process piping installation project", the implementation of flange installation project, apply to "sub -" as a unit of the quota, and then multiplied by factor 0.61.
Sets 6 volumes of industrial pipes "pipe *0.6""
According to the provisions of the same set of welding blind plate diameter pipe installation section multiplied by 0.61.Use installation quota sixth book "process piping installation project", the implementation of flange installation project, apply to "sub -" as a unit of the quota, and then multiplied by factor 0.61.But this is a blind plate off the need for blind to other production costs, but no such item. Blind plate is actually cut round steel plate, cut blind plate can be regarded as welding blind plate reverse process, according to 0.3, total is 0.9, rough can be counted as 1 pipe fittings, this reason clear party A should be able to accept.

Share to: