(1) Check the installation of the roof concealed works, such as air conditioning system, fire spray, smoke system, supply, power distribution system, background music and other lines are installed in place and the hidden acceptance. (2) according to the design requirements around the leveling, the middle of the shed from the conventional arch (3) the boom can be used to cast the board when the embedded parts or reserved hook connection, can also be used offset screws, fixed in the upstairs after drilling (4) boom keel spacing by the manufacturers to provide a reasonable distribution of materials, keel connection to be fixed after the line leveling. (5) all metal parts such as no electroplating, must first brush rust oil twice (6) the edge of the gypsum board planed into a chamfer, and then with a tapping screw and keel compound, tighten. (7) gypsum board docking slit 2-3mm, and chamfer, covered with caulking putty, the joint belt buried in the putty, and putty to the gypsum board chamfer filled, after the plate with a flat plate leveling The

Share to: