Home > categories > Home & Garden > Hanging Baskets > High-level construction with a basket of secondary boxes should be installed on what floor
Question:

High-level construction with a basket of secondary boxes should be installed on what floor

Which specification has been written on the outer frame can not park the basket platform

Answer:

the height of the operating basket should be set up operating personnel dedicated safety belt hanging safety belt and safety lock
Safety rope should be fixed in the reliable location of the building shall not be connected with any part of the hanging blue, and should meet the following requirements: 1), safety rope should meet the current national standard "seat belt" GB6095 requirements, the diameter should be with the security lock 3), the components of the safety lock should be intact, complete, specifications and direction of the logo should be in accordance with the requirements of the two sides, Clearly visible

Share to: