Home > categories > Construction & Real Estate > Geogrids > Highway construction steps?
Question:

Highway construction steps?

Who can elaborate on the highway construction steps, as well as laying materials, the more detailed the better!!!

Answer:

Demolition, digging the foundation, do the water, cables, communications and other projects, backfill coarse stone, fine stone, paving asphalt, for protection. Feicheng Lianyi Engineering Plastics Co., Ltd. mainly produces all kinds of plastic geogrid, glass fiber, polyester geogrid, geogrid, biaxial plastic geogrid, geotextile composite geomembrane, geotextile, geogrid, geocell and other engineering materials
TGS-D20-20 TGS-D30-30 TGS-D40-40 TGS-D50-50 warp knitted polyester geogrid TGS-D50-35 TGS-D80-50 TGS-D80-80 geocell TGGS100-400 TGGS150-400 TGGS200-400; composite geomembrane specification: a film of a cloth, a cloth film two. 200 grams, 1500 grams of standard (three layer) three-dimensional vegetation net products are mainly used in highway, railway, water conservancy, electricity, water and soil conservation and environmental greening and infrastructure, has been widely used in the national key project of highway and railway etc.
The specifications are as follows: Geogrid TGDG25 TGDG35 TGDG50 TGDG80 TGDG110 TGDG120 TGDG150 width of 1 meters -3 meters; bidirectional geogrid TGSG20-20 width 2.5-5m TGSG15-15 TGSG25-25 TGSG30-30 TGSG40-40 GS30-30 GS50-50 m; plastic composite grid GS60-60 GS80-80 GS80-60 GS150-150 width 4-6m meters; BJG35-35 BJG50-50 BJG60-60 BJG80-80 glassgrid width 4-6 meters;

Share to: