Answer:

Practice proved 20mm thick XPS extruded insulation board, the insulation effect is equivalent to 50mm thick foam polystyrene, 120mm thick cement perlite
The new composite sheet is a new type of building material which is developed from five to ten years. The new building materials can meet the technical indexes of building structure, insulation and other related aspects, and have low cost and investment. Light weight, easy construction,
When installing the wall panel, only one board can be lifted at one time It should be used for the special fixture supplied by the manufacturer of the rock wool sandwich panel Lifting process to slow down, to use the wind rope to be controlled to prevent the wall with the device has been bump, scaffolding raised parts with soft data package sandwich plate fixation method: one is the self-tapping screw through the wall directly to the wall in the secondary structure Another method is the self-tapping screw connected directly to the wall sub-structure via the coupling