Question:

How to build a tower crane?

How to build a tower crane?

Answer:

4, combination and installation with the boom, hung with arm pull rod.5, the assembly and installation of crane. This boom just installed in the rotary device, the other end is able to lift and hang rod, in accordance with the installation instructions.The power supply auxiliary hoist with 6, switch on the tower cap following installation, the installation of counterweight boom hoist with the.
Nowadays, most tower cranes used in construction sites have self lifting function, but they can not leave the coordination of cranes when they are installed.Here's the tower crane installation:1, track laying: few walking tower crane, if the working position is not changed in a stage, rail crane fixtures will be locked.Some tower cranes have no running wheels, and the tower cranes are installed directly on the required basis.2. Install the tower crane chassis parts: installation requirements, installation, and placed in the location of the weight block.3. Install the basic tower, revolving parts and tower cap.Each tower crane has the basic height of the tower installation, the installation height of the rotating device and tower cap, these work is the use of sufficient lifting capacity of the car crane to complete.
7, the boom of the horizontal installation, setup of counterweight, main hoist installation, installation sequence of these large, there are provisions in the instructions.8 、 install operating room, main cable and control cable. Installation of crane wire rope, hook, lifting the car has been in the assembly of the boom when installed.9, at this time has completed the basic installation, the later self lifting installation, the main work by the tower crane itself equipment and artificial to complete.10 tower crane from basic height to work height.Each type of tower crane has different self lifting mounting methods. In fact, in addition to carrying heavy loads, the installation of a large number of high-strength bolts is a heavy work.11, the above is the general procedure, the actual installation work in strict accordance with the installation instructions. According to historical experience, tower crane installation accidents often occur in some professional installation team.12, the old type of tower crane installation is relatively simple, but also have independent installation, and now the development of automobile crane is not a must, general use of car crane can complete all the installation.

Share to: