Question:

How to calculate the length of the elevator rail?

How to calculate the length of the elevator rail?

Answer:

Mainly based on the total height of the hoistway! The length of the general elevator rail is 5 meters / root!
According to the calculation, construction plans pit, floor, top height, guide each 5 meters.
The length of each rail is fixed, the main rail only 2 kinds of bar, a kind of 3 meters, a 5 meters. If the length of the rail used for the whole well is calculated, it is possible to directly calculate the depth of the well, since the total length of the guideway is only a little above the length of the hoistway. Although I did not calculate much, but I have rowed over, the top of the rail, according to the top of the well road, only less than one arm distance, and this requirement is not very accurate, can only distance from the top of the well, the closer the better, can not be too far.