Question:

How to install the warm wind Yuba aluminum plate on the ceiling

How to install the warm wind Yuba aluminum plate on the ceiling

Answer:

Yuba inside the instructions will generally have instructions, Yuba sub-body and the front cover, the body is lying on the integrated ceiling of the keel, the front cover and buckle plate as in the keel.
Now Yuba are integrated Yuba, well installed. Because now Yuba are in full accordance with the integrated way to design the ceiling. If you still buy the old Yuba, you must buy the adapter box can be installed on the integrated ceiling.
There are some differences between the requirements and methods of the mouth: 1.300 * 300 or 300 * 600 aluminum plate hanging ceiling: leave a 300 * 300 buckle plate position can not be installed. 2. Striped aluminum bar, it is best to install the buckle plate when the size of the opening of the Yuba, in the installation of the buckle when leaving a good installation hole in the hanging on the preparation of two than the ceiling of the main keel span more solid Of the wood, do install Yuba use. 3. Plastic gusset plate, basically the same as above 4. Waterproof gypsum board ceiling and sauna board ceiling, because to confirm the location of the keel, please also install the buckle when the Yuba installed hole size installed.
Method: Yuba installation - stay line (wire): 1. General light warm type bath requirements 4 sets of lines (light warm two groups, ventilation group 1, lighting 1 group) by the five wires (top is a zero line 4 root control Fire line, the following switch is a fire line, four control the fire line) 2. Wind-warm Yuba (PTC ceramic heating film heating) requires 5 sets of lines, (lighting 1, ventilation 1, PTC heat sink 2 Group, internal circulation blower negative ion group 1) Yuba Installation - Ventilation Ventilation fan requires a tuyere to suck out the indoor air. The diameter of the outlet is generally 10CM, generally in the ceiling before the open well. Yuba installation - the installation of the mouth of the general Yuba openings for the 300 * 300, there are Yuba openings for the 300 * 400 or so. According to the different buckle on the reserved security