Question:

How to properly regulate the installation of pvc plastic anti-static floor

How to properly regulate the installation of pvc plastic anti-static floor

Answer:

First, the mobile installation: between the floor and the floor with the manufacturers supporting the special connection with a bonding tape, floor and floor surface is not bonded, you can freely roll up or remove the PVC floor, easy to move. Second, the fixed installation: 1. Semi-fixed: special double-sided tape, between the floor and the floor with the manufacturers supporting the special double-sided adhesive tape with one, while the floor and the ground is also connected together, can effectively prevent The floor due to strenuous movement and the occurrence of movement, opening, but also facilitate the future because of the need to do the entire site to move. 2. Local bonding: on the ground to the edge of the floor as the reference inward brush 20cm adhesive. 3. Full Adhesive Adhesive: All the brushes are to be laid on the ground. [Grass-roots requirements]: construction ground floor must be clean, durable clean, high flatness, and no cracks. The concrete surface moisture content can not exceed 2.5%. Gypsum floor moisture content shall not exceed 0.5%. Before the floor laying. Floor after dust, you can lay PVC plastic sports flooring. Such as the original rough surface can also be built about 2mm self-leveling. If it is non-absorbent ground, such as mineral grassroots, stone, tiles, etc., can be directly pavement. 【Note】: If the basement and other wet ground, the floor must be waterproof layer to isolate water vapor.
Please professional construction team construction is the best!
The construction of the professional construction team is better, if you need to install their own can also follow the steps: 1, the base treatment; 2, trowel scraping leveling cement leveling; 3, brushing conductive primer; 4, laying copper foil; 7, welding; 8, the surface clean before installation to determine a good installation environment 碃 籂 100 dumplings know the book version of the top of the fire ----- hope to be helpful.

Share to: