I would like to ask, switch lights suitable for when to install it? Can not paint all the latex paint a good re-security, and then paint a job to fill a wall. This will not make the wall flowers? Find the correct installation order!

Answer:

Bathroom and kitchen loaded with short feet, it is appropriate to use porcelain screw dwarf lamp head. Threaded head of the wiring, the phase line (switch line) should be connected to the center contact terminal, the zero line connected to the threaded terminal.
Lamp installation precautions The most basic requirements for lamp installation must be firm. Indoor installation of wall lamps, bedside lamps, table lamps, floor lamps, mirror lights and other lamps, the height of less than 24m and below, the metal shell of the lamp should be grounded to ensure the use of safety.
The overall process of decoration is: pre-design - the main demolition - water and electricity transformation - carpentry - tile - brush wall paint - kitchen ceiling - cabinet installation - wooden door installation - floor installation - shop Stickers - Radiator Installation - Switch Sockets Installation - Lighting Installation - Hardware Installation - Curtain Rod Installation - Pioneer Cleaning - Furniture Entry - Appliances Installation - Home Accessories.
In the decoration process switching lamps suitable for wall, floor, etc. after the completion of installation.