Answer:

3, waterproof layer set and standard construction methods: to be painted 2 to 3 times, or should be added fiberglass cloth, and each brushing the thickness of the cured material shall not be less than 1 mm, and should be completely dry (about 5 -8 hours) and then the next construction. After brushing, but also in the paint waterproof layer to do a mortar protective layer, and finally paste the tile.
2, waterproof layer: In order to prevent the rain into the roof, groundwater into the wall, basement and underground structures, indoor water into the floor and walls and other materials layer.
1, to do after the dry do, or prone to the phenomenon of wall skin off.