Home > categories > Construction & Real Estate > Engineered Flooring > Mianqi composite floor drum up how to do?
Question:

Mianqi composite floor drum up how to do?

Mianqi composite floor drum up how to do?

Answer:

You can remove the already bulging part, and then re-install one by one, to the wall, the excess part of the cut, and keep the floor and the wall has 10-15mm gap, the gap can be through the base line Install and cleverly cover up. Do not simply cut with the cutting tool in the musters, so that while the floor is no longer bulging, it is too ugly. There is a solution (provided that the floor quality is very good): the skirting, buckle buckle removed, the floor pad with pad up, with a fan blowing (dry can also), and keep the room ventilated and dry, Time the floor is likely to recover, once again remind, the premise is the floor quality is good. Do not remove the floor after the bubble floor will be exposed to sunlight, as this will cause the floor can not be restored.
Less than two months after the floor pavement drum up, this is the installation of quality problems. Should be in accordance with the floor of the relevant provisions of the sales, requiring businessmen to send people to the scene. In general, if only improperly installed, too close, leaving the gap is small, you can open, and then re-pavement on the line. But if the composite floor of the original adhesive layer stratification, it is the quality of the floor, they should replace the floor. And, once such a problem occurs, it is best to return. Because, this quality of the quality of the floor is poor, there will be problems later. If your house is on the ground floor, it may be caused by too much moisture on the ground. But if this is the case, the factory workers should be told when you carry out the inspection before installation. If not, it is their approval to meet the pavement conditions, the responsibility is still their. I said these, it is estimated. Or should be sent to the scene after the business to determine. I hope my answer will help you. And then add: If you are not a regular business to buy or other reasons can not be repaired by them. So, after removing the wet cause, it can only be improperly installed. That is, when the pavement did not leave enough expansion of the gap. The repair method is: you can remove the already bulging part, and then re-install one by one, to the wall, the excess part of the cut, and keep the floor and the wall has 10-15mm gap, the gap can Through the installation of the baseboard and cleverly covered.

Share to: