Question:

On the measurement of total station

Ask, general highway tunnel measurement with the total station to measure which aspects? The more detailed the better

Answer:

Slag road slope line, shotcrete receiver measurement, measurement of highway tunnel excavation section, the most important measure is the monitoring and measurement precision of total station but couldn't finish that much. Ha-ha
Steel arch support and Lifang line checking, bottom excavation and invert excavation, lining template checking and lofting, invert pavement template checking, reinforced lofting and lining ditch school inspection, line and template checking
The first instrument identification, according to the drawings issued by the tunnel portal design to determine, determine the portal after the slope portal to lofting, tunnel excavation and excavation contour checking (i.e. overexcavation measurement)