Question:

Power distribution equipment should be prepared before the blackout?

Power distribution equipment should be prepared before the blackout?

Answer:

after the high and low voltage power failure, the work must be carried out before the first inspection
electrician received power outage notice, pull down the knife switch, accept fuse.
The actual operation, one man operation, another voice.
Before the power failure, the person in charge or the electrical appliance technician should fill in the work order.