If you do the above preparations, you can install it. ?? 1. First, under the eaves, the top and bottom of the window set the ink line, according to the specific circumstances to determine the required height. ?? 2. Install the starting bar from the bottom and leave room for the angle, J-shaped and other accessories. Between the starting bar and the starting bar to set aside at least 6mm of expansion, nails please nail in the middle of the starting nail hole. Note that the starting bar is parallel to the eaves and windows. Construction Site ?? Attachment installation 3. When installing the outer corner of the column to stay in the top of the 6-8mm space, and from the top began to nail, the first nail to nail in the top of the first nail hole at the top, the rest is nailed in the middle of the nail hole, And at every 200mm nail. The installation of the inner and outer columns is basically the same, and the precautions are basically the same. Both corner posts should be installed before the decorative panels are installed, paying attention to the vertical and neatness of the two corners.
Install the hanging plate when the next from the bottom of the installation, in the corner pillars and hanging plate also set aside between 8-10mm space to prevent thermal expansion and contraction. In the installation of the time not to pull up and down the decorative panels, so that planks naturally sagging. Installed plywood should be able to move freely on both sides. Please ensure that the bottom of the decorative board between the connection in place, do not pull too tight when installed. When installing the horizontal trim plate, connect the first trim plate to the starting bar. Pay attention to view the windows, eaves and adjacent wall panels between the level, neat. Each installation of 5 to 6 hanging plate must check the level of the situation. Nail nails do not up and down the strong pull trim, do not give any tension or pressure hanging plate. In the window under the hanging plate, the first than the length of the window in the hanging plate to make a mark, cut with scissors, and then cut off the excess part of the tool knife. With a punch in the cutting edge of every 20-40cm to play a hole. In the gable on the hanging plate when the first J-shaped bar in the top of the gable, every 20-40cm nail about. The lap between the veneer should be as far away as possible from the entrance or more places, which is conducive to improving the overall decorative effect.
In addition to the main decorative panels, in order to increase the decorative effect, the other is equipped with some necessary accessories, such as the angle column, outside the corner column, starting bar, J-type, connecting strip and so on. In order to ensure the best decorative effect, the correct installation is also very important. Here we will decorate the basic installation steps and precautions for your PVC.
Before installation, please determine the number of hanging plates and accessories according to the actual situation of the house. In addition, the use of some suitable tools and equipment during the installation will help to improve the installation speed and effect. Commonly used tools are: electric saws (desktop or portable), hand hammers, fine teeth straight knife saws, rectangular ruler, level ruler, tape, ink lines, protective glasses, tool knives, iron scissors; Hole clamp. ?? If the old house is to be renovated, the installation surface should be completely removed before installation. Nail loose the board, remove the damaged board, remove the loose filler, in the doors and windows around and other places to re-fill to prevent moisture, and fill all the gaps to ensure a good housing sealing effect. When installed, it is best to use cold and heat resistant materials to do the bottom plate, so that both can guarantee the straight and quality of the board, but also easier to pin equipment. If it is to build a new building, it requires the framework of the wall must be vertical, between the bones to be neat and orderly.