Home > categories > Electrical Equipment & Supplies > Other Wiring Accessories > Ready to start a machine, ask the master to a single configuration! The
Question:

Ready to start a machine, ask the master to a single configuration! The

Our teacher asked us to draw the building of the integrated wiring diagram, please draw what the essentials? How to start? What is the picture to be detailed? More

Answer:

The main room is to look at the relocation of the engine room environment and management, security and speed of these several on the line. Environment: mainly to see if there is no temperature, humidity monitoring, whether within a reasonable range; into the staff after the strict management, wearing a shoe cover and overalls dress conditions; floor, etc. is anti-static; server placement and cable finishing The whole is not neat, etc., which can see the overall level of the engine room. Security: there is no hardware firewall, fire settings are complete or not. Speed: according to the need to choose whether the BGP multi-line room, so that managers provide an IP test speed and so on. In addition you can see or ask what kind of company in the rental of such a room, big companies, well-known companies and more, I put the server that layer of the room, a large are Panasonic branch, and Other well-known brands, if it is a very small company, it means that the engine room may be mismanaged or chaotic, if someone using the server to provide illegal services, may cause the entire network problems, thus affecting your server and network stability.
Red line "FireWire" blue "zero line" color line "ground" In short, as long as the two-color wire can be connected to the ground can be.
Strong and weak electricity is strictly prohibited to wear the same pipe, including through the switch, the socket box and the common cartridge; strength wire laying parallel spacing of not less than 300mm.