Question:

Scaffold removal should comply with those requirements......

Scaffold removal should comply with those requirements......

Answer:

3 removal of safety technical measures should be made clear to each operator. 4 removal of the scaffolding materials, debris and ground obstacles, and will be affected by the mechanical and electrical equipment and other pipelines, such as removal or protection.
Demolition safety requirementsThe removal order should be 1 layers from the top down, at the same time no homework.2 remove the frame rods and connectors, springboard and other materials, should be used in rolling, prohibited throw down. The foot lever and remove the plate have been demolished, should be disposable.3 all the pieces of the wall should be removed from the scaffold layer by layer, it is strictly forbidden to take the whole or a few layers of the demolition of the wall and then dismantle the scaffolding; the demolition of the height difference should not be greater than two steps, such as the height difference is greater than the two step should be added to strengthen the wall.4 when the scaffolding removed to the lower part of the last long steel pipe height, according to the needs of the site in the appropriate position to take temporary support reinforcement, after the demolition of the wall.
Preparation of scaffold safety demolition before demolition1 check the scaffold fastener connection, the wall, the support system is in line with safety requirements.2 according to the inspection results, supplement and improve the design of the demolition process, and after the implementation of the approval.