Question:

The installation method of color steel activity room

The installation method of color steel activity room

Answer:

Caigang activity board room and building almost the same, will be around and the wall foundation leveling, the best use of reinforced concrete, more solid; and then column, with the beam will be linked to the skeleton, the partition, the outer wall and the door window frame; Followed by laying the floor, and then put a layer of upward, and then on the roof and roof panels; the final installation of doors and windows, pull vertical support. There is sanitary ware, ah, hardware and the like. In fact, this is the light steel structure, and the heavy steel structure plant is very similar to the color of steel activities room hidden project is in the construction process, after the completion of a process, will be covered by the next process, all can not be completed after the inspection site , Do the room decoration, "hidden project" is the key, if the "hidden project" is not done, the surface decoration was beautiful, but also in vain. "Hidden project" can be divided into water installation, electrical installation and moisture, water and other projects. Each of which can not be ignored, if any link is a problem, may bring serious economic losses, and even harm to personal safety. Waterproof construction of the construction process and material identification, to avoid unnecessary economic losses and injuries.
What kind of structure to look at the drawings to say
① Before installation, the construction unit shall check the product certificate, design document and pre-assembly record of the component, and check the size of the recording component. Deformation of the steel structure, defects beyond the allowable deviation should be processed. Before installation, should be prepared in detail the measurement and correction process, thick steel plate welding should be installed before the simulation of the product structure of the process test, the preparation of the corresponding construction process. On the assembled roof truss should be a certain degree of arrogance. ② steel structure hoisting in place, the component positioning axis, elevation and other design requirements of the control point to do a good job marking, the quality of the lifting connector for welding before the inspection. Installed temporary support and steel cable to make steel roof truss in the construction process safe and stable. ③ steel installation, the construction unit should be submitted to each component after lifting the elevation size, welding, painting, etc. were submitted to the supervision and acceptance.

Share to: