In the warm coil there is a second layer of steel mesh below the coil, the role of a fixed warm tube; the role of 2 to bear the weight of the insulation board for a long time due to pressure and collapse.
The above layer of steel mesh is the end of the warm pipe laying after the test pressure, add the filling layer is the bean layer, and then laying a layer of steel mesh, the role of 1 is to increase the compression.
Steel wire mesh is mainly to prevent the ground cracking. If you are tiles, marble floor, you can not shop steel mesh. If you prepare the shop composite floor, it is still a layer of steel mesh as well. Directly to the network shop in the geothermal coil, steel wire is not afraid to step on.