The project cost in hydropower No.3 shaft wall is solid brick or insulating brick?

The project cost in hydropower No.3 shaft wall is solid brick or insulating brick?

Answer:

From the structure principle, hydropower shaft with solid brick, is to consider the safety performance of the structure.
Aerated concrete for external walls is to save money. One side is the outer wall.. Solid bricks are the first thing, safety comes first.