Question:

The small side wall of the small side wall and inverted arch in the high speed tunnel

I would like to ask the high-speed rail tunnel invert small side wall and arch with the small side of the wall of the hanging formwork of what a good method?

Answer:

The pouring of inverted arch and the pouring of the short side wall, do not step in place, install the side die on the invert
Die casting. Install the inverted L hanger on the side wall.
The self - made invert sliding formwork trolley is used to fix the side plate directly on the trolley. This is the best way