Home > categories > Construction & Real Estate > Brick > Toilet floor tiles with what to add a good barrier to waterproof material
Question:

Toilet floor tiles with what to add a good barrier to waterproof material

My home bathroom floor tiles gap between how to do ah? Is the newly renovated, just finished filling with the sealant, but part of the location of the exfoliation of the ride through the museum, but after all the way to leave the water, please help there is no good way to catch Ah, the best is not easy to fall off the waterproof, if the product is best to bring the brand, very grateful, I am very anxious people, more

Answer:

Just rely on the gap waterproof is to die, waterproof mainly depends on the waterproof layer, such as: the East rain rainbow or the golden shield two components of the infestation through the tide of the turtles to kill the waterproof coating can be, each time do not brush too thick, After .4 times, there is a layer of waterproof film formed, and then can be tiled.
This is actually strange to your bricklayer under the tiles are generally done again or twice the waterproof, but now that these are useless, the only possible way to have the effect is that you buy white cement and then mixed with a waterproofing solution should not use The glass glue that things dry too fast but I think the effect must also be very there you have the bathroom home to wear a lot of money to fight the turtles to kill the following may be the floor of the joints are inevitable less water it next time to remember finished Waterproof you all the water to see if the leak is leaked if you have to pay him tiles when the bottom of the scratch in a layer of water with a mixture of cement grinding up and then dry on the tiles
There are three characteristics of the bathroom waterproof: one is not affected by nature, the temperature is not changed; the second is the construction area is small, the walls of yin and yang more, wear the floor of the pipeline more; Third, the wall waterproof layer on the tile, Compatibility with binders is good. According to the above three characteristics of the bathroom waterproof construction plan only the most appropriate coating. Selection of materials are mainly compound polymer polyurethane waterproof coating; cement mortar; Operators should be strictly protected waterproof coating has been done, and timely protection layer. Before working as a protective layer, any person shall not enter the construction site, no one shall stack debris in the above, in the kitchen bathroom door to set the eye-catching signs, in order to avoid damage to the waterproof layer. Waterproof protective layer construction, not in the waterproof layer on the mortar, the mortar is not sprinkled waterproof layer, to Seiko fine do, shall not damage the waterproof layer.
The only correct way is that you do not want to hear the method, but also can not do the way is: the floor tiles all knocked out, and then the wall from the ground half a meter of the wall is knocked (at least 20CM), and then The original did not do a good job of the overall waterproof layer again, remember to have to do the wall at the same time, do at least 24 hours after the water test, is full of water test is also leaking, confirmed no longer leaking After paving in the shop. Do not imagine there are other tinkering can be done once and for all means, unfortunately, no, to solve the moment, but also leaking.