Question:

What are the layout requirements of concrete pump for building engineering?

What are the layout requirements of concrete pump for building engineering?

Answer:

Concrete pump or pump truck layout, parking site should have enough space, in order to ensure concrete mixing truck feeding, shunting convenience
When more than one concrete pump or pump truck is pouring at the same time, the selected location should be the closest to each other. It is better to pour the concrete at the same time, so as to avoid retaining the construction joint.
When more than one concrete pump or pump truck is pouring at the same time, the selected location should be the closest to each other. It is better to pour the concrete at the same time, so as to avoid retaining the construction joint.
The concrete pump shall be as close as possible to the casting site. In the use of cloth rod work, should make the casting parts as far as possible within the working range of the distribution rod, as little as possible to move the pump, that is able to complete the pouring.
The setting of concrete pump should be steady and firm, with heavy vehicle running condition