Answer:

pay close attention to weather forecast, do a good job in Taiwan flood prevention work, if necessary, should be reinforced in the construction of the project do a good job of building materials, rain and moisture work the construction site of the road, the facilities must be smooth drainage, as far as possible rain to stop the water, to prevent the ground water into the basement foundation, the basic project should do a good job slope anti-skid and anti-collapse in the rainy season before doing live housing, equipment, drainage and rain measures Ready to use the water pump and related equipment, prepare the right amount of plastic cloth, linoleum and other rain material encountered heavy rain should immediately stop the pouring of concrete, and has been pouring silicon parts of the plastic film covered all mechanical and electrical equipment to build the protective shed to be strong, and take rain, flood prevention measures, installation of grounding safety devices, electrical box leakage protection device must be sensitive and reliable, and often check the construction site of the tower crane, construction elevator, outside the scaffolding need to install lightning protection device, grounding resistance is not greater than 4Ω the rainy season construction to do a good job of anti-skid reinforcement work all mechanical equipment after the rain should first check whether the circuit is intact Dry and so on
reasonable organization of construction arrangements, so that sunny day to pay attention to outdoor work, rain arrangements for indoor work
the preparation of construction organization plan, according to the characteristics of the construction of the rain, will not be the construction of the sub-project in advance or delayed construction