Answer:

Moment limiting torqueWeight limit; weight LimitedThe car looks for car restrictions limitFrom the ceiling to prevent hoistingThe slewing limit is limited to Slewing
1 torque limiter. There are two kinds of mechanical electronic.2 weight limiter. There are two kinds of mechanical and electronic.3, lifting limit device.4, slewing limit device.5, amplitude limiter.6, car anti break shaft device.7, the car anti broken rope device.8, jacking up anti stripping device.9, the collision lights.10, luffing tower crane luffing speed protection.11, walking crane limit limiter.12, all kinds of warning signs.
Answer: 1: height limit2: lifting weight limiter3: torque limiter4: travel limiter5: speed (maximum speed of force must be more than 40m/min)6: put a device (jib tower crane to move) must have7: the rotary limiter (no collector on the revolving part) must have8: car broken rope protection9: anemometer (boom root hinge point height is greater than 50m should be set)10: windproof device (rail type)11: buffer and end stop12: Rail sweeping plate (rail)13: protective cover14: derailment device15: emergency power off switch (red mushroom head)
(1) lift height limit position limiterFor cranes with variable boom angles, the lifting motion must be stopped immediately when the top of the lifting device rises to the 8OOmm at the lower end of the boom.For luffing cranes, lift the top of the hook to the lower end of the frame 500mm. The lifting movement must be stopped immediately.(2) lifting moment limiter and maximum lift limiter;When the lifting torque reaches 90% of its rated value, the lifting torque limiter shall be able to issue an acoustic or red light to indicate the alarm. When the lifting torque exceeds its rated value and reaches 108% of the rated value, the lifting direction and outward direction shall be stopped.If the weight and amplitude indicator are set, the numerical value should be correct, clear and eye-catching. The digital error shall not exceed 5% of the indicated value.When the lifting weight exceeds the maximum weight, maximum lifting weight limiter should emit light or sound alarm, when the load exceeds the maximum weight of 6%, should stop to enhance the direction of movement, but to allow institutions towards the down direction.(3) amplitude limiting deviceA crane shall be equipped with a minimum amplitude limiter and a device for preventing the boom from rebounding backward. The trolley must be equipped with a trolley switch and a terminal buffer.(4) rail clamping device and walking spacing deviceTrack type tower cranes must be equipped with rail clamps. A walking limit device shall be installed at the same time.(5) anemometer;For cranes with a hinge height of more than 50m at the root of the boom, a anemometer shall be installed at the top.(6) lightning protection and anti electromagnetic wave induction device;For the crane whose hinge height is over 50m, the lightning arrester shall be installed according to the actual situation and the electromagnetic interference shall be taken.(7) tower crane shall install limit torque coupling in order to prevent slewing overload.