Home > categories > Machinery & Equipment > Other Construction Machinery > What are the total cost of the project?
Question:

What are the total cost of the project?

What are the total cost of the project?

Answer:

(3) other expenses for the construction of the project, including land fees and other expenses related to the project, that is, the relevant government fees and other expenses related to the future production and operation, that is, the cost of their own operation. (4) preparation fee (including basic reserve fee and price increase reserve fee, that is, risk reservation allowance), (5) loan interest during construction period, this is relatively clear.
The general construction cost includes (1) the cost of construction and installation, that is, the construction and construction costs. (2) purchase fees for equipment, equipment and equipment, such as elevators installed on the installation, transformers, industrial boilers and other equipment, depending on the nature of the project.
Direct costs include direct project costs (labor costs, material costs, construction machinery costs) and measures fee (environmental protection fees, civilized construction costs, safe construction fees, temporary facility fee, night construction fee, two handling fee, large machinery and equipment import and field installation, concrete reinforced concrete template and support fee scaffolding fee, finished project and equipment protection fees, construction fees) precipitation drainage.
Indirect costs (including fees and charges. Engineering engineering scale of fees. The social security fee. The housing provident fund. The dangerous work accident insurance) and enterprise management fees (management personnel wages. Office expenses. Travel and transportation fees. Fixed asset use fee. Instrument use fee labor insurance premium. The employee education expenses. Union funds. Property insurance. Financial expenses. Other taxes.)

Share to: