Question:

Who know the construction technology of glass wool?

nan

Answer:

1, The construction condition. 1.1, The substrate must be dry and be passed acceptance inspection. 1.2, The construction site should be granted with no more than five grade of wind force during construction. 1.3, Effective measures should be taken during construction in rainy days to prevent glass wool from being wetted by rainwater. 2, the main construction tools: wllpaper knife, electric screwdriver and fe, electric screwdriver and 2m guiding rule. 3, Construction process. 4. Construction points. 4.1, Construction preparation: 4.1.1, Material preparation: Prepare the detailed supply planned order of materials according to the drawings and projects condition. All materials approved into the site must be qualified products, complying with the relevant regulatory requirements nationally, industrially and locally. 4.1.2 Construction machinery: All machinery must be tested to ensure their good performance. 4.1.3, Personnel preparation: Technical personnel must be provided with technical training and technical disclosure. 4.1.4, Technical preparation: It needs to know well the drawings, prepare the relevant portfolios and quality acceptance criteria. 4.2 Installation of glass wool. 4.2.1 Select expansion insulation nails with corresponding length according to the thickness of glass wool, and make glass wool into sample plate based on the field condition before installing it. 4.2.3, Using insulation nails screw to pierce glass wool to install them into the wall according to the position of insulation nails on the facade of wall, which requires that glass wool should be assembled tightly and neatly without folds. 4.2.4, All seams should be cling to with each other with the gap of no more 3mm, and finally all seams should be sealed with adhesive tape.
Execution condition 1.1, the wall of the foundation should be dry and has been accepted. 1.2, The wind scale shall be no more than level 5 in the construction site when it is constructing. 1.3, Effective measures should be taken in raining day in order to prevent from wetting glass wool. According to the drawings and engineering, detailed supply plan should be prepared. All materials which are going to march into the construction site must be qualified products, and meet the requirements of relevant national and industrial standards.
I would like to give a brief introduction to the usage of glass wool as the thermal insulation for equipment. 1, Cleaning dust on the surface of equipment. 2, Using adhesive to glue the iron sheet of insulation nails (iron sheet of one square centimeter will be fed in the middle with a slightly harder iron wire of about 8 centimeters) on the surface of the device. Distribution density depends on the weight of glass wool. If insulated cotton is 1 m * 0.5 m, it merely needs to glue seven to eight pieces of iron sheet. When glue of iron sheet finished, the device is like a hedgehog. 3. Once insulation nails sticked firmly, it needs to affix to glass wool, fixing it with a piece of spare iron sheet with a hole in the middle of it (it is round and is a set with insulation nails), and then bend the redundant part of iron wire.
1, The construction condition. 1.1, The substrate must be dry and be passed acceptance inspection. 1.2, The construction site should be granted with no more than five grade of wind force during construction. 1.3, Effective measures should be taken during construction in rainy days to prevent glass wool from being wetted by rainwater. 2, the main construction tools: wllpaper knife, electric screwdriver and fe, electric screwdriver, 2m guiding rule. 3, Construction process. 4. Construction points. 4.1, Construction preparation: 4.1.1, Material preparation: Prepare the detailed supply planned order of materials according to the drawings and projects condition. All materials approved into the site must be qualified products, complying with the relevant regulatory requirements nationally, industrially and locally. 4.1.2 Construction machinery: All machinery must be tested to ensure their good performance. 4.1.3, Personnel preparation: Technical personnel must be provided with technical training and technical disclosure.