Question:

Why is the floor arch? How to handle the arch?

Why is the floor arch? How to handle the arch?

Answer:

Why is the floor arch? How to handle the arch?
The main reason for the arching of the floor is because the concrete floor before the floor is not completely dry, resulting in the late temperature rise after the water can not evaporate and produce expansion, the treatment method is: If the room area is not large, you can ask the professional wood workers first The edge of the wall of the presser foot (kick line) line off, and then cut the saw blade to the edge of the wall saw part, and finally the skirting line can be installed.
When the floor is laid, the shop is too tight, there is no room for stretching, and there is no room for the surrounding space, so that the hot and cold shrink caused the floor from the arch, in the room around, or at least on both sides of the floor to remove the point, Gap, the effect will be better
Floor from the arch reasons: 1, the floor was blisters, the floor volume increases, causing arch. 2, when the laying of the dry season, the old man was the tomb of the fat? Was fat to let the pack to protect the darling of the bite of the body was still strider Tu Tu smear vinegar Ao 簦 薮 薮 ρ 欤 蚨 蚨 ? Quail ah 3, the wall and the floor between the left did not stretch or stay too small, the floor is dry, moisture content is too low. 1, in case of arch, should first remove the skirting board, and in the arched with a large electric arc saw saw a knife, so that it is not because of continued expansion and then arch, and then observe a day or two, If it is no longer arched, replace the floor with the floor into a new floor. 2, if the arched serious, remove the skirting board Watshao off the shop broken off the water, the old floor, resurfacing, in the demolition, the floor surface damage, should be replaced by a new floor. 3, from the skirting board, once again reserved expansion joints; in the room and the room connection to install the buckle; re-install the baseboard, clean up the plaster, putty and other reserved expansion joints; from the floor, re-installed; Floor, ground treatment is flat, dry and then paved.