A project floor-style double row scaffolding more than 30 meters, may I ask the workers to build walls or decoration? Is there a specification limit or requirement?
Introduction Edit plastic pipe is generally synthetic resin, that is, polyester as raw material, adding stabilizers, lubricants, plasticizers, etc
The use of steel scaffold fastener must have qualified certificate. Fastener surface should be anti-rust treatment; fastener parts should be able to flexible rotation; when the fastener clamping steel pipe, the opening of the minimum distance should be not less than 5mm.