Home > categories > Machinery & Equipment > Auxiliary Packaging Machinery > ) After the operation of the work
Question:

) After the operation of the work

) After the operation of the work

Answer:

(2) to make and organize the geometric accuracy of the equipment, the accuracy of the inspection records and other functional test records;
(4) For the problem that can not be adjusted, analyze the reasons, from the equipment design, manufacturing, transportation, storage, installation and other aspects of induction.
(3) the situation in the commissioning of the equipment (including troubleshooting) records;
First disconnect the equipment from the total circuit and power source, and then make the following equipment inspection, record the work:
(1) do a good job after the run of the equipment cleaning, lubrication, fastening, replacement or repair of faulty parts and debugging, so that equipment into the best use of the state;