All aluminum alloy metal shell and steel shell charge which is good? Where is the difference? What is the difference
Fine carpentry steel workers plaster workers paint workers concrete workers masonry waterproof workers welders the template workers the installation of fitter the installation of lifting plumbers ventilators pump operation water supply equipment maintenance fitter water supply equipment electrical water supply instrument workers asphalt concrete paver operator green chemical rockery workers water view workers labor force workers, workers, workers, the crane driver the tower crane driver bulldozer driver build furnace workers the tower crane driver, Piling workers small and medium-sized construction machinery operators
You are too professional, you are not doing the budget, did not understand your problem, you said the need to calculate the cost of scaffolding inside the column is not the meaning of Oh If this is the case, then the model, tied steel, pouring concrete they have to allocate about. This general construction company is a professional protection team, that is, the shelves or team or team, or by the labor touch into the whip Zhuozhuang Biao students Bula team shelves to erection and demolition.
Interior decoration must use the door of the scaffolding, because the height of the indoor door can be transferred to the three kinds of indoor comparison of chicken powder class cooking wine cramming fast Mo Mo convenient, but when renting scaffold must be rented on the wheel, So easy to move in the room, eliminating the trouble of moving back and forth, time can also save a lot of .