I asked about the "plastic" floor tile paving method, please describe its steps?
The main steps: paste the repair of flat ground clean room, good paste compaction correction error spreading along the reference line from the center to spread around the pipeline at the box office, cutting method and cutting method of layering skirt
Key. Tiles are leveling the ground, otherwise very easy to open or damaged floor brick. There are a lot of glue to the ground plate, can choose their own. The shop must be from the center to the periphery, and some of the glue scraping a good 1 minutes after the need to install the use of static after 2 minutes. After sticking, the glue in the seam should be wiped off.
Key tiles is flat ground, otherwise very easy to open or damaged floor brick. There are a lot of glue to the ground plate, can choose their own. Shop paste must be from the center to the surrounding, and some of the glue scraping after the need to be static 1 ~ 2 minutes after use. After sticking, the glue in the seam should be wiped off