Attached to the lifting scaffolding installation site how to write
All obstructions have been removed and all unnecessary restrictions have been removed. Power system can run normally. All the scaffolding bowl bowl has tight connection point.
All threaded connections nuts have been tightened.It should be removed from the live construction load have been evacuated after.
The actual strength of concrete at the attachment structure has reached the design requirements of scaffold.