Can the composite floor be installed,
Theoretically possible. Composite floor installation method 1. In the composite floor before the installation of the first check whether the door can be opened freely, if not, to the bottom of the door to a certain thickness, and then lay a layer of PVC over the ground film, so that can play a noise And the effect of moisture. 2. Place the first composite panel at the corner, the tongue and groove on the wall, with a wooden wedge leaving about 10mm of the expansion joints. 3. When installing the wall to the last board, take a full plate, place it in parallel with the previous tenon, set aside 10mm crossed on the wall end, install until the end of the line, if the remaining material length For 40cm, you can keep to the next line to use. 4. From the second line, the inside of the tongue and groove to be evenly coated with the floor of the special glue (the first line does not glue), the floor is fully installed, and then wet cloth or plastic scraper in time to spill the glue off. 5. Tighten the floor with a hammer and a wooden last. 6. After the first two lines, in a timely manner with a rope or ruler to calibrate. 7. left the last line of time, to take a piece of the whole board, on the already installed on the floor, up and down alignment, and then take another floor, on the board above, one end of the wall, and crossed, along the line Saw, this is the width of the floor required. Installed to the last line of the board, put the wood last block, the use of special fasteners will be squeezed into the floor, after installation 2 hours, the withdrawal of wood last.
The premise is that you will install the case
Technical requirements are not high, you can do it yourself, pay attention to the general installed from the door, inside the corner of the mouth.