Can the walls be piled directly to the bottom of the cast

Can the walls be piled directly to the bottom of the cast

Answer:

Requirements of the wall to the bottom of the beam from the end of 5-8cm to stop, Shen real (different seasons, Shen real period is also different, usually 7-15 days) with inclined card gray sand brick filling, should pay attention to mortar fullness and triangular seam Puzzle
Requires wall masonry to the end of the beam from the end of 3-5cm to stop, Shen real (different seasons, Shen real period is also different, usually 7-15 days) with anti-corrosion treated wooden wedge (or plastic wedge) , And then filled with expanded fine stone concrete.
Frame, frame shear structure filled wall, not directly masonry to the bottom of the beam / bottom. The reason is: 1, direct masonry to the end of the beam, the bottom of the wall after the filling wall will be in the beam, wall joints at the cracks. 2, the direct masonry to the beam at the end of the bottom of the filling wall at the top of the free (no constraints), in the seismic shear wave will collapse.