Clean the operating room floor and wall requirements which
Operating room decoration requirements of the wall
Hospital operating room wall should use light search steel keel partition, to facilitate a variety of pipeline and wall fixed equipment concealed. Surface layer should be used with high hardness, good integrity, sewing less, tightly sealed decorative materials. Can be used 1150 color steel plate, combined with the outlet, return air, observation window, embedded view film lights, equipment cabinets, disinfection cabinet, switch interface, the wall into a whole, to minimize the convex surface and cracks. The wall can be tilted 3 degrees, not only can reduce the dust, and can reflect the angle of light is conducive to health care personnel operation. Can choose the Austrian-made WAX anti-special plate - to strengthen the board. Aseptic wall can be used 600 × 600mm light green tiles a pass to the top. Skirting board should be concave into the wall 1cm, and with the ground into one, corner radius of 40mm rounded corners. Channel on both sides and corner of the wall should be set up two anti-collision board.
In the Western developed countries, the construction of clean operating room, there are a lot of wall surface material or the choice of tiles, and in our country has been transformed clean operating room has no longer use the tiles. Tiles cost low, easy to work, the basic to meet the clean operating room surface material requirements. But the insulation, sound insulation and anti-impact energy is poor. Need to have a solid wall as the grassroots, solid wall and thick, will reduce the operating area of the operating room. Construction requires wet work, heavy workload. Tile paste after the joints need to use a better material to do all the sewing treatment to prevent dust and bacteria.
Two-component polymer modified cement can also be the material of the wall of the operating room. In the solid wall coated with two-component polymer modified cement, the molecules can penetrate the base layer of cement sand layer 2cm to 3cm or so, to form a solid tight shell, and then spray on the surface layer of antibacterial coating that can.
Clean the operating room wall of the building materials are divided into metal and non-metallic two categories. With the development of science and technology, now clean the operating room of the timber is more and more. Now the main use of several domestic materials are analyzed as follows.