Construction plan of asphalt paving?
Construction scheme of bituminous concrete surface course1. preparation before constructionCheck the integrity of the seal coat and the adhesion of the base surface. The local base exposed and the lower part of the lower seal width shall be repaired with the seal construction requirements. In order to be unable to cover the entire layer as qualified, the surface of the lower seal surface, floating mineral materials should be swept to the outside of the road, the surface debris is also cleaned. The construction lofting recovery line, inspection, examination and approval by the engineer of asphalt paving. Paving equipment, rolling equipment and other construction equipment to maintain good operating conditions.