Question:

Construction technology of bridge hanging basket

nan

Answer:

Beam section constructionA, adjust the elevation of the bottom mold, set the pre camber;B, lashing steel and web reinforcement, installation of floor and web longitudinal prestressed pipe;C, installation of internal mold;D, lashing roof reinforcement, the installation of vertical prestressed pipe;E, pouring concrete;F, health, tension, grouting, sealing anchor.
D, the crane will be used to bridge the bottom of the bottom of the platform to lift the platform, and with the front sling, and then install the rear sling;D, installing the rear cross member and rear outer belt;E, to the basket to pre pressure to eliminate the plastic deformation, determine the size of elastic deformationF, the installation of internal and external model walking beam and to the 1# position;
A, pillow and track installation;B, assembled hanging basket main frame;C, installing front cross member and front sling;D, the crane will be used to bridge the bottom of the bottom of the platform to lift the platform, and with the front sling, and then install the rear sling;
Hanging basket construction technology: hanging basket installation - hanging basket preloading - hanging basket forward construction beam sectionIn 0#, 1# section of the completion of the construction of the hanging basket installation, the procedures are as follows: