Construction Technology of Color Wall Plate and Roof

Construction Technology of Color Wall Plate and Roof

Answer:

Color steel plate column, package box, installed yin and yang R angle In the purification area of ??the column with б = 50 color steel plate is also conducive to saving materials and unified yin and yang R angle is 50. First in the doors and windows into the stainless steel door window frame fixed firmly, the door to pay attention to open the direction, installed windows. Door closers should adjust the speed and strength of the opening, usually in the first half of the door when the fast speed, the latter part of the torque is small, slow, to reduce the closing impact and noise. Sealed silicone: in the purification area, where the possible impact of cleanliness of the following gaps, should be coated with sealed silicone: color steel plate between the splicing, R angle and the wall, the roof of all the gaps; air conditioning duct, , The gap between the high efficiency filter and the wall top plate; the gap between the protective pipe groove and the edge of the hole through the ceiling of the wall panel; the gap between all the switch socket lamp and the top plate surface of the color plate; all the process, water supply and drainage, The gap between the glass and the gap between the glass; Sealed silicone should be installed in the color plate is basically ready, better health conditions, after a thorough cleaning dust, unified. Otherwise the silicone seal is easy to pollute, black. Silicone gel within 24 hours after the fight should not have a lot of dust and water rinse the ground may affect the sealing silicone fastening and fastness.
The fine wall panels are loaded into prefabricated components according to the layout, and the adjacent panels are locked between the components. It is worth noting that in the formation of the wall at the same time with the electrical dark pipeline and box. Wall should be vertical, vertical joints to be tight, the gap the more beautiful, vertical seam evenly. In the operation, carefully clean the protective film on the vertical seam temporarily opened, and do not expose. Clean the debris inside the tank and glue the solidified lumps. Otherwise with a large force is also difficult to adjust the vertical seam uniform, dense. 7. Loading the roof: the weight of the roof is supported by the vertical plate and the middle suspension of the T-type aluminum. The long side seam is fixed and reinforced by fixing the insert, and the short side is fixed by T-type aluminum and the plate core pulling rivets. Hanging flat top force to smooth, slit dense uniform, smooth, no trace, no injury. Operation with the same wall.
1. familiar with the drawings, carefully review the color plate layout, node requirements, color steel plate and the building associated with the color plate itself, the color, filler, the basic size requirements, in the color plate partition door, window size and layout, auxiliary materials The type and other unknown content. 2. Secondary platen drawing, which is an important step in the prefabrication and installation of color steel plates, is the design of the drawings can be converted into a second time in the factory processing, the standard specifications into different types of panels, combined to reflect the design intent Of the intermediate conversion map, and in the color plate factory to produce a standard sheet, assembled at the construction site, which can ensure the stability of the wall can also speed up the installation of color plate speed. 3. In the factory prefabricated, according to experience, the door, window and the gap between the full consideration of the gap and installation margin. And in the entire transport production, installation process, to prevent scratches, weight and surface impact, to prevent the emergence of unrecognizable pits and scratches. Color plastic sheet on both sides of the plastic film, only after the completion of all the installation, to thoroughly clean when allowed to peel off. 4. Before the installation of the color steel plate, the work should be carried out after the completion of the floor (floor), and with other relevant conditions such as the installation of large equipment has been shipped in place, dark ground pipeline has been adjusted and the main technical installation of the main work It can be done. The line is laid on the ground by the color plate horizontal projection (50mm wide) and the door, window position. The upper and lower manger center line should be in the same vertical surface error should be within 1.BR% that is 3mm.
Color board room is a kind of light steel as the skeleton, with sandwich panels for the enclosure material, the standard modular series of space combination, the components of the bolt connection, the new concept of environmentally friendly economic housing.
Installed down the slot, down the slot with the general inside and outside the R angle of the aluminum alloy profiles. With the nail fixed on the ground drawn on the line, the location of the nail to a straight line 1.2-1.5m spacing, corner and the distance 0.2m away from the terminal is appropriate, the use of water-stopping rubber strip in the spine before the two strips ( Ф2-3) into the tank, after the formation of a fixed set of waterproof isolation closed. Put the slot for the suppression of aluminum, hard ceiling with a nail gun fixed on the roof, the soft ceiling when the boom hanging in the level, the height of the ceiling to be high.